Starting a daycare
How to Start a Home Daycare
Opening a home daycare takes roughly 60 to 120 days from decision to first child, mostly waiting on background checks and inspections. This checklist covers the order operations actually need to happen — skip a step and you'll wait weeks for the missing one to clear.
Last reviewed:
Short answer
To start a home daycare, check your state's family child care licensing rules first, then set capacity, form a legal entity, buy child-care liability insurance, childproof and pass inspection, complete CPR, first aid, and background clearances, set tuition from local market rates, write a contract and parent handbook, set up enrollment recordkeeping, and market locally. Expect roughly 60 to 120 days, with background checks and inspections as the long poles.
The 10 steps
Check your state's family child care rules
Every state regulates home daycares differently. Search '[your state] family child care licensing' on the .gov site. Some states exempt providers caring for 3 or fewer unrelated children; others require licensing from day one. Pull the rules PDF and read the sections on capacity, square footage, fire safety, and background checks before anything else.
Decide your capacity and age mix
Capacity limits commonly allow a single provider to care for 6–8 children, with stricter caps on infants and toddlers, but this varies widely by state and provider. Two providers can usually go to 12 in many states. Decide the mix you want (infants are higher-revenue but more labor-intensive) before you market.
Get the legal structure right
Consider forming an LLC to separate personal and business liability. Costs and annual fees vary widely by state — ask an accountant or attorney. Get an EIN from the IRS (free, 10 minutes online). Open a business bank account — never commingle.
Buy daycare liability insurance
A general liability policy plus a child-care endorsement runs $400–$1,200/year for a small home program, though cost varies widely by state and provider. Some homeowners insurers will cancel if they learn you run a daycare without disclosing it — call yours before you open.
Childproof and inspect the space
Outlet covers, cabinet locks, gates at all stairs, anchored furniture, smoke and CO detectors on every level, fire extinguisher in the kitchen, locked medicine cabinet. Your licensing inspector will check all of these — do them first, not after.
Get certified and background-checked
Commonly required: CPR and pediatric first aid, a TB test, fingerprint-based background check, and 10–40 hours of pre-service training — check your state's rules. Costs and timing vary by state; nothing else can move until these clear.
Set tuition based on local market
Check published rates and your local child care resource and referral agency, or ask nearby providers directly. Price within $10/week of the average, as a starting point — going lower signals desperation; going higher needs a clear story. Many providers bill weekly in advance; choose a schedule and state it in your contract.
Write the parent handbook and contract
Cover: hours, tuition, late fees, sick policy, vacation policy, termination, holidays, what to bring, photo/social media permission, emergency procedures. The contract is what protects you in disputes — don't skip it because the first family is your friend.
Set up enrollment paperwork and recordkeeping
For each child: enrollment form, emergency contacts, signed contract and handbook, immunization records, allergy/medication forms, photo release, signed authorization for emergency medical care. Keep digital backups; your state may inspect records.
Market locally
Local channels beat national directories for home daycares. Set up a Google Business Profile, post in 2–3 neighborhood Facebook groups, ask your pediatrician's office if you can leave a flyer, and list on free state child care referral sites. Ask satisfied families if they would recommend you.
A realistic 60-to-120-day timeline
- Weeks 1–2: Read state rules, decide capacity, form LLC, open bank account.
- Weeks 2–4: Submit licensing application, schedule background checks, start CPR/first aid course.
- Weeks 4–8: Childproof the space, buy supplies, write handbook, set tuition.
- Weeks 6–10: Licensing inspection, fire inspection, sanitation inspection.
- Weeks 8–12: Build Google Business Profile, post in local groups, hold open house, sign first contracts.
- Week 12+: License issued, first children start. Aim for a staggered start (one new family per week) for the first month.
Frequently asked questions
How much does it cost to start a home daycare?
Do I need a license for a home daycare?
How long does licensing take?
What's a realistic income from a home daycare?
Licensing thresholds, exemptions, and insurance requirements vary by state. Confirm every step against your state's family child care licensing agency before acting on it.
Sources and further reading
- Child Care Licensing and State Resources — U.S. Office of Child Care (childcare.gov)
- National Database of Child Care Licensing Regulations — Administration for Children and Families
- Business guide: plan, launch, and manage your business — U.S. Small Business Administration
- Child and Adult Care Food Program (CACFP) — USDA Food and Nutrition Service
How Caredence supports this
- Home daycare software — Lightweight recordkeeping and tuition for family childcare.
- Childcare software pricing — Current Caredence plans and what each one includes.
Run your daycare on one platform
Caredence brings attendance, billing, messaging, and reporting into one place — so you spend less time on paperwork and more time with kids.